Well Pulling Rig 3 pt

   / Well Pulling Rig 3 pt #21  
We had our pump, pipe, wiring, control box and pressure tank replaced 18 months ago for right around $3000. I did the pressure tank, pump guy did the control box due to time issues. He came back to replace pump/pipe/wire. Our well is 200' deep, pump is set around 180'. We started in '93 on poly pipe, changed to galvanized steel, and now have schedule 120 PVC with stainless steel couplers.
 
   / Well Pulling Rig 3 pt #22  
My original well pipe was galvanized iron pipe, which was replaced last October because it leaking (rusted away). The well contractor replaced it with schedule 80 white white plastic threaded pipe (300').

Believe that is what local pump maintenance and drillers use... Its all I ever see on the trucks and we are in well country....My well is 468 feet deep, and don't know how deep pump is (no records when we bough property)....

Dale
 

Tractor & Equipment Auctions

2007 Hyundai Sonata GLS Sedan (A54815)
2007 Hyundai...
2022 Toro Workman 07921 Electric Utility Cart (A51691)
2022 Toro Workman...
2011 Ram 1500 4x4 Crew Cab Pickup Truck (A53422)
2011 Ram 1500 4x4...
FAE UML/SSL 150 VT BL HYD MULCHING HEAD (A51406)
FAE UML/SSL 150 VT...
black Max power washer (A53421)
black Max power...
2019 Allmand Night-Lite V-Series 7kW S/A Towable Light Tower (A52377)
2019 Allmand...
 
Top