Well Pulling Rig 3 pt

   / Well Pulling Rig 3 pt #21  
We had our pump, pipe, wiring, control box and pressure tank replaced 18 months ago for right around $3000. I did the pressure tank, pump guy did the control box due to time issues. He came back to replace pump/pipe/wire. Our well is 200' deep, pump is set around 180'. We started in '93 on poly pipe, changed to galvanized steel, and now have schedule 120 PVC with stainless steel couplers.
 
   / Well Pulling Rig 3 pt #22  
My original well pipe was galvanized iron pipe, which was replaced last October because it leaking (rusted away). The well contractor replaced it with schedule 80 white white plastic threaded pipe (300').

Believe that is what local pump maintenance and drillers use... Its all I ever see on the trucks and we are in well country....My well is 468 feet deep, and don't know how deep pump is (no records when we bough property)....

Dale
 

Tractor & Equipment Auctions

2015 EAST MANUFACTURING ALUMINUM STEP DECK (A58214)
2015 EAST...
John Deere skidsteer (A55788)
John Deere...
2004 VE ENTERPRISES 500BBL FRAC TANK (A58214)
2004 VE...
2017 Ford Escape AWD SUV (A55758)
2017 Ford Escape...
2007 MACK CV713 ROLL OFF TRUCK (A58017)
2007 MACK CV713...
2009 Yale Veracitor 135VX 12,150lbs Straight Mast Forklift (A56857)
2009 Yale...
 
Top