8NTX
Gold Member
I had a quote from the local electric cooperative 18 months ago, for the cost of running it underground approx. 600 feet. Their quote was $27.00 per foot. I did it myself at a total cost of less than $6.00 per foot including the electrician for two days designing the sytem, hooking it up and even helping with the big "pull".