Dutch445
Elite Member
this load originated at the G.E. plant in Schenectady NY,,new style turbine headed to a new power plant in PA.
making good time today, but i guess traffic was a mess up near Albany as
the load snaked it's way down to rt 20 last week.
i believe this is the first of 3 that will make the trek over the next month
reports say the turbine itself is 350,000# , the entire load over 900,000#,
and with push and pull trucks over 350' long!



making good time today, but i guess traffic was a mess up near Albany as
the load snaked it's way down to rt 20 last week.
i believe this is the first of 3 that will make the trek over the next month
reports say the turbine itself is 350,000# , the entire load over 900,000#,
and with push and pull trucks over 350' long!


