Wow, that's a lot of work and you knocked it right out.
I watched my solar contractor do that with a helper. All I did was dig the holes for the poles. They were big like 4 x 4 x 5 feet deep. I think it took those guys several days to get it all done if not more.
Great going Hayden!
I watched my solar contractor do that with a helper. All I did was dig the holes for the poles. They were big like 4 x 4 x 5 feet deep. I think it took those guys several days to get it all done if not more.
Great going Hayden!