thanks Shane for getting me out of winter hibernation and start updating this thread
It's been a mild winter this year and we're thankful for that for sure.
soooo, to pick up where I left off...
after the BlueSeal took about 3full days to dry
(I guess due to cold temps and dampness in the air on those late fall days), we applied the Delta waterproof membrane.

With two waterproofing membranes in place, I layed the geo fabric in the trench, then the weeping tile and backfilled to grade (4.5') with 3/4" clear stone




with that out of the way it was time to finish "winterizing"

three days later
talk about cuttin' it close

soooo, to pick up where I left off...
after the BlueSeal took about 3full days to dry

With two waterproofing membranes in place, I layed the geo fabric in the trench, then the weeping tile and backfilled to grade (4.5') with 3/4" clear stone




with that out of the way it was time to finish "winterizing"

three days later