Sounds like one would be forced to get the Pitless Adapter & Electric Stubbed out before the Well Driller could pour the bib..In my area the new specs for wells state that a 'bib' (think that is the term) is now part of a well system.
Essentially the well diggers pour about a yard or so of concrete around the well head to seal and prevent surface water from entering the well.
This concrete is sloped away from well in all directions.
Some soils (like sand) could allow easy seepage of surface waters.
When I had my well drilled 12 years ago in Baltimore County, Maryland, they required the casing to be Grouted in.. I paid for 90' of Grout. To me, it was worth it to protect my water supply...