I had concrete ramps poured for my barn. I believe they are 5" thick. How long before I can drive something like an ATV over them? How about a tractor?
 
   / Concrete drying time #2  
I assume these ramps are poured on the ground and not structural concrete "planks" or "beams".

Then ATV probably within a couple days and another one at most for the tractor.
 
   / Concrete drying time #5  
Did you put in any rebar? If so 7 days is plenty cuz if they crack they will not separate so no big deal. Concrete tends to crack eventually outside anyway, but if w.o rebar I would wait as long as you can stand it [up to a month] to give it a chance to reach a good proportion of its ultimate strength. I have broken up parts of a concrete pouring over time as needed. There is no comparison between 1wk and 1mo concrete.
larry
 
   / Concrete drying time #6  
The atv can drive over in 2-3 days. With the tractor, I would wait a week. Both estimates are on the conservative side and your pours are relatively thick at 5".
 
   / Concrete drying time #7  
Concrete does not dry, it cures. Setting is a chemical reaction that requires water to proceed. If you let it dry out, the curing will stop at whatever point it has reached.

Curing rate depends on temperature, but it will normally reach 50% of final strength in a week, and 90% of final strength in 21 days. Moist curing for 28 days will double the final strength of concrete vs. leaving it unprotected in air.
 
   / Concrete drying time #8  
Concrete does not dry, it cures. [Moist curing for 28 days will double the final strength of concrete vs. leaving it unprotected in air.]
Good. .. forgot to mention that.
 
   / Concrete drying time #10  
Moist curing for 28 days will double the final strength of concrete vs. leaving it unprotected in air.

what is your source of this information...?

the compressive strength of concrete is relative to the water/cement (portland) ratio...keeping it wet will enhance the curing but it will not likely "double the strength"...
 

Tractor & Equipment Auctions

2018 Freightliner M2 106 AWD Altec AA55 56ft. Insulated Material Handling Bucket Truck (A60460)
2018 Freightliner...
2005 Sterling Acterra Tender Truck (A56438)
2005 Sterling...
2023 FORD F-650 SUPER DUTY CAB AND CHASSIS TRUCK (A59823)
2023 FORD F-650...
2023 GREAT DANE FLP-0024-00053 53FT FLATBED TRAILER (A59905)
2023 GREAT DANE...
2019 INTERNATIONAL LT625 TANDEM AXLE SLEEPER (A59904)
2019 INTERNATIONAL...
2013 Dorsey Pitts 48ft. 40 Ton T/A Flatbed Equipment Trailer (A60460)
2013 Dorsey Pitts...
 
Top