AKKAMAAN
Veteran Member
I would install a two spool valve with PB first inline, and then a Prince log splitter valve next.
I would advice having the most POWER using and frequent CV first in line, to minimize return flow power losses through the rest of PB valves.....That would put the splitter CV first in the series...Would of course require a PB capable splitter CV....
will still need to feather with needle valve, needle valve will make just make feathering more "responsive"...either feather the valve or install a needle valve to control the flow.