How can I adapt a PTO shaft from the standard 540 to a 15 spline

   / How can I adapt a PTO shaft from the standard 540 to a 15 spline #1  

amanda11270

Silver Member
Joined
Nov 18, 2010
Messages
111
Location
Pennsylvania
Tractor
Bolens Iseki H1502
I have a compact Bolens Iseki tractor that has a 3pt hitch, it has the standard 6 spline pto shaft, how can I adapt it to run a 15 spline snowblower on the rear of my tractor, do they make a adaptor? Its a Gravely blower and 15 spline must be Gravelys PTO size. I guess im looking for a shaft that goes from 6 spline to 15. Where can I find it if its even available.
 
   / How can I adapt a PTO shaft from the standard 540 to a 15 spline #2  
I did a quick google search and didn't turn anything up.

Your best route to take would be to replace the yoke on the tractor end with the standard 1-3/8" 6-spline.

If you can get some measurments on the size of the u-joint fot that yoke (u-joint length and diameter of the caps) you can probabally take it to a place like TSC and match one up.

Here's some examples. They make several sizes

Splined Bore Yoke, 6N - 0270003 | Tractor Supply Company

Splined Bore Yoke, 12N - 0270184 | Tractor Supply Company

Splined Bore Yoke, 35N, 6 Spline - 0270435 | Tractor Supply Company
 
   / How can I adapt a PTO shaft from the standard 540 to a 15 spline #3  
What you might want to try first however, is consult the appropriate Gravely manual to determine input requirement (in RPMs). Six spline PTO components are typically designed for 540 rpm operation. A greater number of splines generally suggest a PTO operating speed of something greater than 540. Say 720, or 1000 - or even 2000 in the case mid PTOs. What I'm trying to say is that- given the 15 spline coupler - your Gravely might not be a 540 rpm machine in the first place.

//greg//
 
   / How can I adapt a PTO shaft from the standard 540 to a 15 spline #5  
Ordinarily the fine spline shaft is 21T. Those adapters are readily available. What uses 15T :confused:
larry
 
   / How can I adapt a PTO shaft from the standard 540 to a 15 spline #6  
I just picked up an MTD Products 40-inch rototiller. I haven't been able to track down any info on it yet. It does have a 15-spline 1-inch diameter (female) jackshaft that needs to connect to the 6-spline 1-3/8 inch pto shaft. I'd prefer an adapter if anyone's found one. I have a Kubota B7100HST-D. Thanks!
 
   / How can I adapt a PTO shaft from the standard 540 to a 15 spline #7  
It might be hard to find that kind of adapter.
Might be easier to find a 1 3/8" adapter to smith keyed shaft( I just bought one from agrisuppy) And then find a 15spline to shaft adapter. Buy a short pice of smith keyed shaft, cut it and stick the adapters back to back with the keyed shaft inside. Set screw.

or maybe look for a speed reducer gear box.
 
   / How can I adapt a PTO shaft from the standard 540 to a 15 spline #8  
In the late 60s, 70s, 80s & early 90s larger models of Simplicity, wheelhorse, John Deere, Bolens, Power King & others all had a 2000 rpm - 1" 15 spline pto. Even if you buy or make an adapter, your snow blower or rototiller rpm may run extra slow because it was engineered for a 2000 rpm input not 540 rpm.
 
   / How can I adapt a PTO shaft from the standard 540 to a 15 spline #9  
What you might want to try first however, is consult the appropriate Gravely manual to determine input requirement (in RPMs). Six spline PTO components are typically designed for 540 rpm operation. A greater number of splines generally suggest a PTO operating speed of something greater than 540. Say 720, or 1000 - or even 2000 in the case mid PTOs. What I'm trying to say is that- given the 15 spline coupler - your Gravely might not be a 540 rpm machine in the first place.

//greg//

What he said. My odd splined stuff is all high speed.
 
   / How can I adapt a PTO shaft from the standard 540 to a 15 spline #10  
Maybe you can make a pulley set up to get speed back and take care of the spline difference problem at the same time.
 
 

Tractor & Equipment Auctions

Wacker Neuson AR14H (A60462)
Wacker Neuson...
JEEP FOR DOUBLE TRAILER (A58214)
JEEP FOR DOUBLE...
2014 International WorkStar 7300 4x4 Altec A55F 55ft. Material Handling Bucket Truck (A60460)
2014 International...
2014 Dodge Charger Sedan (A59231)
2014 Dodge Charger...
1667 (A57192)
1667 (A57192)
2012 SOUTHERN  130 BBL VACUUM TRAILER (A55745)
2012 SOUTHERN 130...
 
Top