Scotty Dive
Platinum Member
I want to start building a retaining wall...we have no shortage of good size boulders here in CT.
The retaining wall will be on the downslope of a 45 degree hill..or up slope depending how you look at it :laughing::laughing:
Some of these rocks won't fit into the bucket and I am not sure my curl could lift them anyway. So...what is a good way to drag them or get them to where I want them. I was thinking of picking them up via chain but am nervous having them sway and damaging the tractor and blalancing too. I could chain and drag them from the backside of the tractor but then I would be backing down the hill and dragging the rocks backwards.
Any ideas?
The retaining wall will be on the downslope of a 45 degree hill..or up slope depending how you look at it :laughing::laughing:
Some of these rocks won't fit into the bucket and I am not sure my curl could lift them anyway. So...what is a good way to drag them or get them to where I want them. I was thinking of picking them up via chain but am nervous having them sway and damaging the tractor and blalancing too. I could chain and drag them from the backside of the tractor but then I would be backing down the hill and dragging the rocks backwards.
Any ideas?