debo1683
Silver Member
I am working on wiring my pole barn and have a couple of questions ..
1. When I poured concrete I wasn't thinking ahead and didn't run any conduit through the floor. What is the best way to tackle this now that the floor is poured? I don't really want to do an LB on the outside of the building, so I guess I am looking at tearing up a small portion of concrete... What is the best way to go about this? I have a hammer drill and some fairly large bits ... I just planned on going after it with this...
2. I am grounding this panel separate from my main panel at the house. The run is about 100 feet and I am using aluminum wire. I have read a few differing opinions on whether or not I need to bond my metal siding to the ground bar. What is your opinion on this? I have installed an outlet and two lights outside. All their grounding wires do not touch the metal siding ...
3. When I do my grounding rod, does this need to run outside? Or can I put it in the hole that I will eventually be digging to get conduit through the building?
Hopefully I don't start any arguments with these questions. Sometimes electric can be touchy on here. I just want to make sure I am doing things correctly.
Thanks!
1. When I poured concrete I wasn't thinking ahead and didn't run any conduit through the floor. What is the best way to tackle this now that the floor is poured? I don't really want to do an LB on the outside of the building, so I guess I am looking at tearing up a small portion of concrete... What is the best way to go about this? I have a hammer drill and some fairly large bits ... I just planned on going after it with this...
2. I am grounding this panel separate from my main panel at the house. The run is about 100 feet and I am using aluminum wire. I have read a few differing opinions on whether or not I need to bond my metal siding to the ground bar. What is your opinion on this? I have installed an outlet and two lights outside. All their grounding wires do not touch the metal siding ...
3. When I do my grounding rod, does this need to run outside? Or can I put it in the hole that I will eventually be digging to get conduit through the building?
Hopefully I don't start any arguments with these questions. Sometimes electric can be touchy on here. I just want to make sure I am doing things correctly.
Thanks!