How much does it flood?
A mile and a half down the road (and down the creek), a guy put in some nice piers, a truck flatbed trailer, and built up the approaches. First good gully washer we had, washed out the approaches and shifted the trailer half off the piers. The second gully washer washed the deck downstream a couple of hundred feet and buried 90% of it. Just the one corner is visible.
My first bridge washed out twice. I used a 4' and 2' tin horn with 2'X2'X4' limestone blocks. The blocks held but all of the road base and fill kept getting washed out when the water went over. It was only a matter of time before the entire thing got swept away.
I ended up replacing it with a concrete low water crossing and two 2' tinhorns for drainage. I might not be able to cross during high water events but the water drains away within a day. If you build a bridge make sure it can handle the floods.