New Modular Questions

   / New Modular Questions #11  
No not a lowered ceiling............this modular company used manufactured joists (mini I beams of waferboard glued to 2 x3 sized top and bottom) Very straight and clean easy to run stuff by drilling between these joists.

We will be doing a suspended ceiling because way to much stuff we might want to access ( water lines for heat electric etc. My daughter went with an extra deep basement for high ceilings, but foundation company screwed up and while crane was installing the home they realized they didn't make basement deep enough so they added two more sill plates to get depth correct for stairs.
 
   / New Modular Questions
  • Thread Starter
#13  
No not a lowered ceiling............this modular company used manufactured joists (mini I beams of waferboard glued to 2 x3 sized top and bottom) Very straight and clean easy to run stuff by drilling between these joists.

We will be doing a suspended ceiling because way to much stuff we might want to access ( water lines for heat electric etc. My daughter went with an extra deep basement for high ceilings, but foundation company screwed up and while crane was installing the home they realized they didn't make basement deep enough so they added two more sill plates to get depth correct for stairs.


I'm using a double sill plate. Do you remember how they attached the multiple sill plates together? I'm planning counter-sunk lag bolts.
 

Tractor & Equipment Auctions

EZ-GO MPT 1000 Electric Utility Cart (A51694)
EZ-GO MPT 1000...
8'x8' Aluminum Cover (LOCAL TOWNSHIP) (A50774)
8'x8' Aluminum...
2020 CHEVROLET W4500 16FT REEFER BOX TRUCK (A52576)
2020 CHEVROLET...
2006 Dodge Sprinter 2500 Van (A50323)
2006 Dodge...
2019 UTILITY VS2RA 53FT REEFER TRAILER (A52141)
2019 UTILITY VS2RA...
2014 John Deere 700K LGP Dozer (RIDE AND DRIVE) (A50774)
2014 John Deere...
 
Top