Looking for help with fill dirt. Have a smaller 7ac plot of land in coastal SC that has held horses for many years, it is low and has about 4-5' of clay then good sand underneath. Pine trees border the property ditch lines as well as in the pastures, though they are scattered about. Needless to say, it holds lots of water. Lots.
Wife and I are going to put a home on site but work needs to be done.
There is a site works contractor down the road that has unscreened fill material with roots and other organic material in it that they will truck to me and spread out with dozer along with about 20 dump trucks of large tree stumps they will bring over, dig holes for them and cap.
Thinking of using dug out material from stump holes to use at home site and fill material for surrounding areas just off home. Going to use ripper rake to remove large debris in the fill material after placement with my Kubota 3750 with a LA950A, also have Woods box blade w/ depth ajustable Ripper teeth, 5' Woods roller, & yard rake to help with some things. Even doing this, I know there will be a fairly big settling issue down the road for the "yard" areas and a big settling issue where the stumps are.
The contractor has also said if access road can't handle the use, they will bring in material to make it work.
Advise? Problems seen or experienced? All advise welcome, good or bad.
Thank you
Wife and I are going to put a home on site but work needs to be done.
There is a site works contractor down the road that has unscreened fill material with roots and other organic material in it that they will truck to me and spread out with dozer along with about 20 dump trucks of large tree stumps they will bring over, dig holes for them and cap.
Thinking of using dug out material from stump holes to use at home site and fill material for surrounding areas just off home. Going to use ripper rake to remove large debris in the fill material after placement with my Kubota 3750 with a LA950A, also have Woods box blade w/ depth ajustable Ripper teeth, 5' Woods roller, & yard rake to help with some things. Even doing this, I know there will be a fairly big settling issue down the road for the "yard" areas and a big settling issue where the stumps are.
The contractor has also said if access road can't handle the use, they will bring in material to make it work.
Advise? Problems seen or experienced? All advise welcome, good or bad.
Thank you