As a contractor, I think it's very important to provide new, good looking materials to my client. When buying Sheetrock the other day, I rejected several sheets that where perfectly fine, but had some ugly coloring to them. My client doesn't know this, but in my opinion, hanging those ugly sheets would have looked bad until I had them painted. I feel the same about the trusses in the mud. I have no idea if they are damaged it not, but since the using of them is of some concern, the right thing to do is replace them with new ones that look new. It's what he paid for!!!! I also don't believe in trying to talk a client into ugly materials. Its counter productive to the overall job, and good referrals in the future. It's their money, I give them what they want.

I don't think simply replacing all of them is right or necessary or what I have asked for. They are going to come out and inspect. I suspect some will have to be repaired in the field and some will have to be replaced. With engineer stamped papers for the repairs I am comfortable.

As for them being just dirty I am not sure that I care if it does not effect the functionality.
 
   / Trusses delivered - problems
  • Thread Starter
#42  
As a contractor, I think it's very important to provide new, good looking materials to my client. When buying Sheetrock the other day, I rejected several sheets that where perfectly fine, but had some ugly coloring to them. My client doesn't know this, but in my opinion, hanging those ugly sheets would have looked bad until I had them painted. I feel the same about the trusses in the mud. I have no idea if they are damaged it not, but since the using of them is of some concern, the right thing to do is replace them with new ones that look new. It's what he paid for!!!! I also don't believe in trying to talk a client into ugly materials. Its counter productive to the overall job, and good referrals in the future. It's their money, I give them what they want.

I don't think simply replacing all of them is right or necessary or what I have asked for. They are going to come out and inspect. I suspect some will have to be repaired in the field and some will have to be replaced. With engineer stamped papers for the repairs I am comfortable.

As for them being just dirty I am not sure that I care if it does not effect the functionality.
 
   / Trusses delivered - problems #43  
I don't think simply replacing all of them is right or necessary or what I have asked for. They are going to come out and inspect. I suspect some will have to be repaired in the field and some will have to be replaced. With engineer stamped papers for the repairs I am comfortable.

As for them being just dirty I am not sure that I care if it does not effect the functionality.
I'm sure they will be just fine if they were banded before they got dropped. Kinda surprised that they could drop your steel that close to the site yet not the trusses...guessing that was a call made by the GC. These things come together in a hurry and "staging" of materials is an art and perhaps you mentioned your septic field (rightly so on a new system). Most likely wanted the steel closer (don't want to buckle one of those) and wanted the trusses out of the way (on a per piece basis they don't weigh much in the whole vast scheme of things...when they built my 30x56 shop building the trusses were placed by 3 guys on step ladders). Again I think the pros know what they are doing and you will be happy when it's over.
 
   / Trusses delivered - problems #44  
Why are you making up stuff that I didn't say?
Eddie...I apologize if I misinterpreted what you were trying to relate...I thought I had tried to phrase my response as more of a question...my intention was not to misconstrue what you said...
I highly respect your attitude and work ethic when it comes to satisfying your clients...based on the projects etc. that you have posted...IMO your clients are lucky to have such a conscientious contractor...your workmanship is top notch...


Oh I am sure that is part of the problem. They are 300 ft from the actual building site. Thankfully they can get from the pile of trusses to the building site without going over my septic field or through the actual nice part of my yard. They can remain in what was a corn field. I am sure the builder is NOT happy about that, but that is not my fight to fight.

As for watching them build the barn I intend to be here as much as my schedule allows. I can work from home for a good bit of things that I do. I would love to watch them set the 60 foot trusses.

For the record the steel for the sides and roof was delivered yesterday. That guy had no problem backing his semi into the driveway. Since we had dry weather the last several days he could drive right up next to the building. Used his crane to drop the steel right near the building site. Driver was a nice guy, and I am glad that I got to talk to him. Always interested in learning.
Thanks...the only thing missing now (I suspect others are also interested) is a picture of the trusses where they were dropped...a pic of the entire site would also be interesting to see also IMO...

Best of luck with your new building...and thanks for being so congenial with your responses...:thumbsup:
 
   / Trusses delivered - problems #45  
I would love to watch them set the 60 foot trusses.
With a good crane operator and ground crew, pretty much routine though still pretty cool to observe. On the applications where I was present, the ground crew secured a sling at two places (not the peak) then placed it over the crane hook. With a guide rope on one end to control sway, away it went.
 
   / Trusses delivered - problems #46  
While mine were only 45' long, here is how I set them.
DSCN2196.JPGDSCN2199.JPGDSCN2212.JPGDSCN2222.JPGDSCN2225.JPG
As to the thread I think the trusses are going to be just fine, other than some mud. I do agree with Eddie, they should look new when put up.
Good luck with the build and keep us posted with some pictures.:)
 
   / Trusses delivered - problems #47  
Working commercial construction this kind of thing happens often. Don't sweat it
 
   / Trusses delivered - problems #48  
1. I don't know how big of a deal this might be, but I would be concerned about any significant amount of mud left on the trusses holding water against them long term and promoting rot.

2. Significant discoloration is also an issue. It should be possible to inspect the trusses from the ground--rot or mildew should easily show up. If they are discolored this will not be the case.

Speak to the engineer about these possibilities. Maybe they should lightly pressure wash them and inspect after that to remove mud and reduce discoloration.
 
   / Trusses delivered - problems #49  
   / Trusses delivered - problems
  • Thread Starter
#50  
I'm sure they will be just fine if they were banded before they got dropped. Kinda surprised that they could drop your steel that close to the site yet not the trusses...guessing that was a call made by the GC. These things come together in a hurry and "staging" of materials is an art and perhaps you mentioned your septic field (rightly so on a new system). Most likely wanted the steel closer (don't want to buckle one of those) and wanted the trusses out of the way (on a per piece basis they don't weigh much in the whole vast scheme of things...when they built my 30x56 shop building the trusses were placed by 3 guys on step ladders). Again I think the pros know what they are doing and you will be happy when it's over.

It was not a call made by the GC. The GC specifically told the truss company NOT to deliver. We had rain on Thursday. Trusses delivered on Friday. Truss truck driver says he could not get in the driveway. So he backed in off the road into a field. Due to the rain there was a lot of mud. He got stuck.

Steel was delivered Monday. There was no rain Friday, Sat, Sun or Monday. That semi was able to back up into the driveway. The construction site, being the high point of the property, was dry by then. He was able to back out the back end of the driveway right up to the building site. He had a crane on the truck and could have delivered the steel even further over off the side of the truck if he had to. Probably another good 60 feet maybe?

Ultimately the delivery issue is on the truss company. They have said they are taking responsibility and will fix or replace any trusses that were damaged.

The main issue is that to get the trusses off the truck (and thus get the truck unstuck) a farmer tied a rope around them and pulled them sideways off the delivery truck. It would appear that damaged several of the trusses that I can see and who knows about the parts I cannot see. So each one will have to be inspected and repaired/replaced as necessary.

Had the truss company waited until Monday or yesterday the area they delivered to would have been dry enough that they would not have gotten stuck. So then the only issue would be delivering the trusses some 300 feet from the actual job site. That would have been a problem between the GC and the truss company that would not have affected me other than it would have taken the GC additional time to finish the build. Since I am on a fixed price contract that would really not be a big deal to me.
 

Tractor & Equipment Auctions

2011 WABASH 53x102 DRY VAN (A53426)
2011 WABASH 53x102...
2006 Kubota L3130 (A50123)
2006 Kubota L3130...
2025 SDLANCH SDLGC80 UNUSED Electric Golf Cart (A53117)
2025 SDLANCH...
Coleman 274BH Lantern Edition Travel Trailer (A51694)
Coleman 274BH...
4"x8' Treated Post, 36 Piece Bundle (A52384)
4"x8' Treated...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
 
Top