Kyle_in_Tex
Super Star Member
After having serious issues with the barn building company and terminating our contract we have just about reached the finish line. Concrete was supposed to be included and that's where we went our seperate ways. I kept my final 20% and will have to finish on my own. I'm great with that. Had an excellent concrete crew come in and pour a minimum of 5.5" thick slab with 3/8 rebar and 3 5x12 aprons at each 12x12 door for just about the same money I kept by terminating the contract. Ended up working out great. The pole barn installer will be coming tomorrow on his own to finish installing the roll up doors and some odds and ends including where I hit the building with my tractor when I was having to do a final grade for the original company against what I was told by the salesman.
Anyways, I'm excited to have concrete. We're leaving in the am to go visit my folks in Rockport for a few days and when we come back it'll be a mad dash to get some things moved in there. Then I'll be getting the electrical run and lights installed! Should be a fun filled expensive two weeks coming up!
Brett
![]()
Wave hi to me if you come through Giddings