When I had mine built, the materials sat on the ground for a couple of weeks before the construction crew arrived to put it up. The pile of materials was not covered with a tarp or anything, but I didn't pay much attention to it, it's gonna be a building, what could hurt it? It rained a couple of times on the pile before installation day.
The crew came and put up the building, and it wasn't till then that I noticed a big mud stain on the inside of the top panel of one of my overhead doors where rain had splashed mud up onto what was the underside of one of the material piles.
It hasn't been important enough to put a ladder up and wash it, but it is important enough to mildly annoy me and make me wish I had covered that pile of materials.
The materials came 3 weeks ago. They really did a super job in wrapping everything up, cause we have had some off and on rain. I don't have the doors, as they wait till the building is done and a door company from Knoxville will install them.