New garage and home build

   / New garage and home build
  • Thread Starter
#71  
You've made a lot of progress over the winter!!! House looks nice. When does Spring happen there?


The pics of the rear with all the snow was a few weeks ago. The front was about a week ago. We still have snow where it drifted and is deep especially on the north side. Today was 2” of more snow but in the 40’s so spring is just around the corner.
 
   / New garage and home build #73  
I was just wondering how you were doing yesterday when I thought I saw your truck. Very nice.:thumbsup:
 
Last edited:
   / New garage and home build
  • Thread Starter
#74  
Thanks guys. We hope to be in the 1st of June but if we keep getting days like today then it may take longer.
Master bedroom and gas fireplace with tv above. Stone will go all around fireplace in inset except for glass (where cardboard is). Bookcases on both sides.
F137B803-87E9-49CA-B227-39BED7B312CB.jpeg13F8E2FC-6DC7-435E-99E2-CAA5F25E77AB.jpeg9EEBA7C4-E686-42F3-A205-BB0F80900AE9.jpeg
 
   / New garage and home build #75  
My builder told me in the beginning, when we hang the sheetrock, we are half done....
 
   / New garage and home build #76  
Very nice!
 
   / New garage and home build
  • Thread Starter
#77  
E06623B8-E165-458A-8ED9-9C2C2246DD0D.jpegB28099C2-82B0-4724-8947-26AAB0BEC2EB.jpeg8138397B-9967-4751-871F-04DEB3EAFC58.jpeg

Progress on the house and FINALLY starting the detached garage. It’s been record setting rain so hopefully we can get get it done quickly.
 
   / New garage and home build #78  
Progress is good!!!! Thanks for the pictures and update
 
   / New garage and home build
  • Thread Starter
#80  
Love the siding and color scheme... Wifey picked it out, right? :D

We actually picked it together. She sees the darker color and a green (name Seagrass) and I see grey so we’re both happy. We drove the gc nuts cuz we asked for 9 samples of vinyl. What looked good in the sample book looked different in big pieces.

The front is coming together with the stone pillars but it’s taking the mason forever. 6-7 days on 1 pillar. Slowpoke.
 

Tractor & Equipment Auctions

Mower King Q.A Pallet Forks (A50121)
Mower King Q.A...
2004 Mustang Deluxe Convertible (A50324)
2004 Mustang...
2012 Bobcat S850 (A50120)
2012 Bobcat S850...
2018 Ford F-150 4x4 Crew Cab Pickup Truck (A50323)
2018 Ford F-150...
2018 International WorkStar 7400 T/A Dump Truck (A50323)
2018 International...
2004 Dodge Ram 1500 4x4 SLT Crew Cab Pickup Truck (A50323)
2004 Dodge Ram...
 
Top