L5740 - adding multiple aux hydraulics

   / L5740 - adding multiple aux hydraulics
  • Thread Starter
#11  
Yes I am furnishing valves and mounts as well as the T&T sets.

If you go to the Fit Rite website and go to the customers share section, there is a guy with an L6060 on page 3&4 that added a pair of diverters. You can see the diverters as well as the control grip installed. I have others that have added a triple diverter set in the same way.

I normally recommend that a customer go with the 3 factory valves and then 3 diverters if-when they need 6 sets of rear remotes. Makes for a very neat & clean installation with ZERO additional hoses.

As far as the 2 front 3/4th functions, I can see with what you want to do that those would be handy. :thumbsup:

Are your lead times the same for valves and mounts as they are for TnT, about 26 weeks?

Good advice on going with 3 factory valves, right now I only have two, and neither are float! It would make sense to get the third factory valve with float, then diverters as needed.
 
   / L5740 - adding multiple aux hydraulics #12  
Are your lead times the same for valves and mounts as they are for TnT, about 26 weeks?

Good advice on going with 3 factory valves, right now I only have two, and neither are float! It would make sense to get the third factory valve with float, then diverters as needed.

Valves are 6-10 weeks, depending on the what kind of valve set. Often quicker.

Please tell me where you got the 26 week lead times? I have never quoted longer than 24 weeks. There are times when I have taken longer due to unforeseen issues, but I have never quoted a 26 week lead time. :no:

If you are considering getting products from me, you should fill out the Fit Rite contact page. ;)
 
   / L5740 - adding multiple aux hydraulics
  • Thread Starter
#13  
Valves are 6-10 weeks, depending on the what kind of valve set. Often quicker.

Please tell me where you got the 26 week lead times? I have never quoted longer than 24 weeks. There are times when I have taken longer due to unforeseen issues, but I have never quoted a 26 week lead time. :no:

If you are considering getting products from me, you should fill out the Fit Rite contact page. ;)

I had 26 weeks in my head for some reason, my mistake. I will fill out the contact page, I believe I'm going with your custom TnT cylinders over the agri supply units. I'd be about 12 weeks closer if I wasn't dilly dallying. That will give me some time to decide the route I want to go with the aux hydraulics.
 
   / L5740 - adding multiple aux hydraulics #14  
Nothing wrong thinking outside the box. Your tractor is your canvas to make what suits you. Having a fully articulated offset mower is interesting.
Working on a FEL grapple with hydraulic polesaw combo. Never seen one and may not work but sometimes I need to flesh out an idea to see the pros and cons.
Those FEL firewood processors look pretty cool and require multiple controls. Just maintain a healthy respect for hydraulic safety to protect the operator.
 

Tractor & Equipment Auctions

RIGID 150 PSI AIR COMPRESSOR (A50854)
RIGID 150 PSI AIR...
2012 Chevrolet Colorado 4x4 Ext. Cab Pickup Truck (A48081)
2012 Chevrolet...
2020 Kia Rio Sedan (A48082)
2020 Kia Rio Sedan...
2022 Club Car Tempo Golf Cart (A48082)
2022 Club Car...
2006 CHEVROLET SILVERADO 4X4 PICKUP TRUCK (A51222)
2006 CHEVROLET...
2020 Crane Carrier Co Side Loader Garbage Truck (A48081)
2020 Crane Carrier...
 
Top