bindian
Super Member
Weigh the trailer before or after you weigh the ex on the trailer. Then subtract to get ex weight. Then you don't have to unload and load the ex at the scales.Once you get your machine and get it assembled and filled with fluids, load it on your trailer and drive to a set of certified scales and pay to have it weighed.
hugs, Brandi