Yesterday was another productive day, insulation almost done, fireplace moving along, I got the hardware on all the doors, and rekeyed them to use the same key as the main house. Lots of detail work, like making the block for the POE doorbell camera to mount on, so it blends into the cedar siding. Put the columns on the front porch, and lots of other things that will make it a better job when it’s all done.
Put the loader on the tractor and hauled trash out of the old folks home to the dumpster.
The code required R49 in the ceiling, the insulation contractor suggested 3” of foam and then 6” of unfazed fiberglass, which actually yields a bit more.
Today they are supposed to deliver the Sheetrock, they say it will all get hung tomorrow. I’ll miss that part, as I’ll be Iron Mountain, MI on the UP for most of the day.
That means I’ll miss Ken’s pool party (with the BBQ truck) as well.
62° and clear, hazy, but clear, high in the upper 80’s.
Yesterday was another productive day, insulation almost done, fireplace moving along, I got the hardware on all the doors, and rekeyed them to use the same key as the main house. Lots of detail work, like making the block for the POE doorbell camera to mount on, so it blends into the cedar siding. Put the columns on the front porch, and lots of other things that will make it a better job when it’s all done.
Put the loader on the tractor and hauled trash out of the old folks home to the dumpster.
The code required R49 in the ceiling, the insulation contractor suggested 3” of foam and then 6” of unfazed fiberglass, which actually yields a bit more.
Today they are supposed to deliver the Sheetrock, they say it will all get hung tomorrow. I’ll miss that part, as I’ll be Iron Mountain, MI on the UP for most of the day.
That means I’ll miss Ken’s pool party (with the BBQ truck) as well.