Got on my tractor one day and push down on the forward pedal and it stayed there. I can still use the tractor but now I have to "feel" for neutral.
I can't seem to find any information out there on what to do.
I have a Mahindra Service Catalog, but it is not very well written ( I think it was...
Hi guys I hope everyone is doing well.
My grapple build came out fantastic and a shout out to snowback and all that helped with the design decisions.
I have another issue, I have to level and pack a pad for a 30x40 steel building.
I have cleared the top soil and now I am trying to level it and...
The fittings on the crossbar are JIC - they are the only JIC fittings in the build.
I have a JIC to NPT fitting to get back to the hose connection which is an NPT male.
The 1/2" QD's are connected by a 1/2" male NPT to a 3/8" JIC male Bulkhead fitting.
Finally done!
I was trying to upload a video but can't figure out how to do it.
This has been a fun build and I want to express my thanks to everyone that offered suggestions and advice.
I appreciate you all!
Some of the advice I took, some I didn't, and some I wish I would have! and of...
Ok so I got bored waiting for my hydraulic parts to get in.
I decided to add lights to my ROPS. Just got them finished, tomorrow I will take some pics of the install.
Also got my cylinder and 3rd function in today.
Got the lines all measured up and hoses and fittings ordered.
It'll be a week or so before the rest of my parts get in, I post some more along the way and of course a video once it's hooked up and running!
Well, Almost done!
Got my grapple dry fit for extra assurance. Now it's off to paint and then patiently ( :( )waiting for hydraulics and 3rd function kit.
Also got my Quick Attach on and my two most used implements set up for it, my box blade and my rotary cutter; I still need to set up my...
I have added more support. I am not sure I like the looks if it, but I think it is strong enough.
Still deciding if I am going to change the clam supports, but I am running out of material :)
Here is the final design, in checking out other builds - even with the 2" schedule 40 pipe for the cross members, having two should make it more than strong enough.
We will see.
Well,
I am finally moving forward on my grapple build. See attached pictures.
I have one of the quick attach plates tacked together and will check for fit this afternoon.
Then tomorrow I plan on getting it all welded up.
Just waiting for the third function kit to come in along with my cylinder...