Gary_in_Indiana
Elite Member
- Joined
- Apr 22, 2002
- Messages
- 3,373
- Location
- Fort Wayne, IN
- Tractor
- John Deere 4200 MFWD HST w/ JD 420 FEL w/ 61" loader bucket & toothbar & JD 37 BH w/ 12" bucket
<font color="blue"> Utility companies...can run lighter gauge service laterals from the transformer to your meter than you are allowed to run from the meter into the service entrance.</font>
Now there's a scary thought! /forums/images/graemlins/shocked.gif
I was lucky with mine and the utility company asked me what I intended doing in the barn and (thinking on my feet for once in my life) I said, "I'll have compressors, welders, plasma cutters sandblasters and some other equipment running in there" so they ran a #2 drop in from the pole for me instead of the standard #4. It was the same kind of 'logic' that I employed when I went with the 200 amp service in the first place; If I get it now, it's there. /forums/images/graemlins/smile.gif If I don't and then need to upgrade later, it's going to be expensive. /forums/images/graemlins/frown.gif
Now there's a scary thought! /forums/images/graemlins/shocked.gif
I was lucky with mine and the utility company asked me what I intended doing in the barn and (thinking on my feet for once in my life) I said, "I'll have compressors, welders, plasma cutters sandblasters and some other equipment running in there" so they ran a #2 drop in from the pole for me instead of the standard #4. It was the same kind of 'logic' that I employed when I went with the 200 amp service in the first place; If I get it now, it's there. /forums/images/graemlins/smile.gif If I don't and then need to upgrade later, it's going to be expensive. /forums/images/graemlins/frown.gif