banjodunn
Veteran Member
Here is another possible option.
Install the loader valve that came with the loader.
Use one of the remote spools to feed the loader valve with the lever locked on.
So the normal path would be something like this. Pump to remote, and remote to 3pt.
Exception would be when you use the loader. Now the flow is pump to remote , remote spool to loader valve, back to remote, then 3pt.
The loader will not tie up the remote, as the loader will have all the flow with the lever locked on, until you use another spool on the remote, and then yu share the pump flow between the loader and another spool..
If the loader and or remote is using all the pump flow, then the 3pt will have none for that time that the valve levers are engaged.
Good thinking at least this does not tie all the remotes up
Jon