Addition question

/ Addition question
  • Thread Starter
#11  
Just adding room addition and keeping existing roofline. I'm still trying to figure out how to connect bottom treated girt to the existing structure. Running into a brain freeze issue right now
 
/ Addition question #12  
just cut back the existing corner girt half way and then attach the new one. will need to work on the siding a bit at those points by loosening it up, attach new board and reattach.
the Skirt boards should be T&G and tied in same way, may need a metal blade on a saws-all match up to the existing building, 2x6 or 2x8 with best ground contact treatment.

Mark
 

Marketplace Items

2018 HYUNDAI VC2530152-JS DRY VAN TRAILER (A59575)
2018 HYUNDAI...
Rotary SPOA9-200 Automotive Lift (A59228)
Rotary SPOA9-200...
2019 DRAGON ESP 150BBL ALUMINUM (A60736)
2019 DRAGON ESP...
2020 Takeuchi TL8R2 Track Loader with 72in Tooth Bucket (A61307)
2020 Takeuchi...
2015 John Deere 6105E (A60462)
2015 John Deere...
2014 Magnum 7696BLA Light Tower (A59213)
2014 Magnum...
 
Top