ditzel said:Not sure about your local electrical code, but here in N.J. they follow NEC, and driving a 2nd ground rod at the barn would fail inspection. That would only be permissable if you had a seperate metered service on the barn fed directly from the power co. Otherwise you need 4 wire(2 hots, neutral and a ground)
Sorry but that is not true. NEC 250-24 specifies that a separate building can have its own ground rod and local ground.
paul