Ray2210
Silver Member
I just made up an attachment for my KK sub soiler on Saturday and plowed in 200 ft of 1 inch poly with my 2210 about 8 inches deep. I used a piece of pre bent electrical conduit to feed the pipe down in behind the sub soiler. I attached some tabs to the sub soiler and the conduit and then ran a rod through so the conduit could pivot like a rudder. It hangs back quite a ways and after seeing a post with a commercially available attachment that worked that way I thought it was a good idea. It was. I had to make about six passes without the attachment to soften the ground up and then I pulled the pipe in. It went in like closing up a zip lock bag. It was slick as anything. Where I had to go through sod I pre slit it with a shovel so it wouldn't tear it up as bad. I will probably make some changes to the attachment as it was all scabbed together out of what ever scrap I had but the basic prototype worked very well. I'll post some pics when I get a chance.