I had to call all 3 company's back, and even at that only 2 responded today(I guess their "economy" is fantastic). Superior wall quote was $13,200. A poured wall quote including footers was $13,800.
Unless I am missing something, it looks like I can dig & pour footers, then 12" block, rebar every 2' and fill the block,
and pour the slab for way under $13K.
Walls:
1385 12" blocks @ $1.41 ea...........$1952.85
42 bags type S Mortar @$7.75.......$325.50
6 tons of sand @$31.00................$186.00
33 sticks 1/2 rebar @$8.50............$280.50
Labor.........................................$1900.00
20 yards of concrete to fill block.....$2000.00
$6644.85
Footers:
24"x12"
15 yards of crete
Labor and materials ....
approx........$2000.00
Slab:
14 yards of crete
Labor and materials.....
approx........$2000.00
Total nut....................................$10,644.85
If I poured the walls I would still have to add the slab which would bring the cost over $15K....
It looks like Block for me