Soil Conservation evaluated the pond site for sutability, marked the expected water line and designed my dam. They also sized the overflow pipe and the spillway. All for free. It utilized 3700 cu yds just in the dam. Three of the four contractors asked for a copy of the design doc to do their bid. One said "I don't need to know that info." No he was not a season contractor. Guess who I did not use. Took most of a month to build and about 4 months to fill. The estimate is 5 million gallons in about 2.75 acres.
 
   / Building a pond questions #52  
I'm not sure what say the state would have in a USDA funded EQUIP program. I wasn't approached about public use, but had he, you can bet I'd have told him where to stick his riser. /forums/images/graemlins/laugh.gif
 

Tractor & Equipment Auctions

2014 Whisper Watt Generator (A49461)
2014 Whisper Watt...
2017 Ford F-550 Ext. Cab Valve Maintenance Truck (A50323)
2017 Ford F-550...
2007 John Deere 4320 Cab 4wd (A51039)
2007 John Deere...
2014 John Deere 635F Grain Platform (A50657)
2014 John Deere...
2017 Dodge Ram 1500 4x4 Crew Cab Pickup Truck (A50323)
2017 Dodge Ram...
2007 MACK GRANITE ROLL OFF TRUCK (A51222)
2007 MACK GRANITE...
 
Top