Well Eddy has been telling my from the start of this long saga to build a dock and I just didnt want to mess with it or rebuild it in 10 years when it rots. This week I finally came around to the idea in a somewhat limited fashion. Just got back home from the limestone quarry a couple hours from us. Picked up this roughly 7ft x 10ft piece of limestone. Going to pour some concrete posts before my water comes up any higher to place it on and cantilever this slab out over the water. It's not much but won't rot and will give me a space for a couple of chairs off the dirt and out of the weeds. Fixing some lunch then going out to see if my CTL will lift it. Scaled at 5,100 lbs so hoping the width is not too much weight away from the machine to move it.