Hi All,
I'm burying a PVC water line and also burying electrical in separate schedule 80 PVC. Both in same trench. The trench is about 3 feet deep. Too deep to use a metal detector later should I need to locate the water/electric line.
Can a tone be put on the electric line that I'm burying or should I bury a separate pair of wires (bell wire) to use to put a tone on later to be used for locating?
I'm burying a PVC water line and also burying electrical in separate schedule 80 PVC. Both in same trench. The trench is about 3 feet deep. Too deep to use a metal detector later should I need to locate the water/electric line.
Can a tone be put on the electric line that I'm burying or should I bury a separate pair of wires (bell wire) to use to put a tone on later to be used for locating?