Caught by the inflation demon

   / Caught by the inflation demon #41  
Sometimes the best thing to do is just walk. Stop the entire project for now. I’ve missed out on a house, cars, trucks and felt bad at the time but later realized it was for the better.
Sometimes second chances don’t come around… unless maybe winning the lottery?

Back in 2012 I found the property that ticked all boxes… I made full price offer non contingent and the owner was a customer of mine though I had never been to the place he built… the wife was selling saying it was her husbands dream property… the day my offer came in they had just accepted an offer for 100k less with contingencies…

Ten years later there is no way I could touch a place like that plus the property taxes would bankrupt.

300% plus appreciation sure puts a smile on the assessors face.

Another home hitting the market now appraised at 900k in 2011 and listing will be 3.5m… if it sells for 3.5 the property tax would be about 45k

Current owners pay $3,100 and built in 1950’s
 
Last edited:
   / Caught by the inflation demon #42  
Normally, a builder will have terms/language in the contract about holding a price quote for a certain time period, and in this economy, I would expect that to be in full force. I am not siding with the builder, but it would be abnormal for a building contract to have open-ended timeframes when it came to costs (labor or materials). Builders would not stay in business long in this economy if they had to honor pricing more than about a week in the past!

Were there plans for a construction loan and mortgage? Normally, having a bank involved for a construction loan will help formalize things -- may also allow the builder to lock in pricing for materials, window packages, etc earlier in the process. Some items take a lot longer to get nowadays, so smart builders are locking that stuff in early and ordering it as soon as the bank is on board and the builder is able to make draws.

Why did it take so long for the permit to be issued? 6 months seems like a long time to me.
 
   / Caught by the inflation demon #43  
6 months would be a miracle here... 2 to 3 years for a single family with proper zoning, setbacks under Oakland's Design Review.

I've known some to go 4 years with many changes... and then changes are changed.

Don't forget tree inventory and endangered species compliance.

Issued Permit is good for one year and no disturbing soil in rainy season.

I look out my window and see a home that is weather tight but unfinished...

The owner passed away under construction and now its12 years from start.

Last I heard it requires a new permit since so much time lapsed with new code requirements and fees are 150k.

If construction takes longer than a year but continuous they simply charge renewal fees ever 12 months.
 
   / Caught by the inflation demon #44  
You wont make a cent in court. .. hes offering you the return of your deposit.

its not his fault prices have gone nuts. But it is his fault for not placing a clause in contract to cover price increases due to inflation.

as long as he returns all funds less permit fee, i dont see why you would try to force a job completion that will have to be done half assed to prevent his bankruptcy. I know my state will refund permit fees if not used within 6 months. Not sure about yours.
You don't know they won't get a cent in court. You have not read the contract.

I agree I would not want to force the job on the guy as you will get shoddy work I bet. However the measure of damages is not just the refund of the deposit. The guy signed a contract to build the home at $265K. The measure of the damages is what it would cost him to get the house built today. If that is $365K his damages are $100K.

Now that said I have not read the contract either. There may be clauses in there that allow the builder to do exactly what he is doing and OP is faced with the choice of paying the increase or finding a new builder..... who will probably charge the same new higher cost.

That all said the first thing to do is always sit down and talk to the builder. Find out what has increased so much. As several folks have said in this thread some supplies have gone up, others have not.

See if you can cut back on some of the stuff and do it yourself. Maybe have the builder frame and do the exterior and the "kids" do the drywall? Or cut back on the "upgrades" somewhere.

Just some thoughts.
 
   / Caught by the inflation demon #45  
It's not going to get any cheaper...

Lumber might be down, but PVC, wire, appliances are all still high.

Lock in a price and bite the bullet.
 
   / Caught by the inflation demon #46  
Inflation is getting everyone. No silver bullet to manage that. Good luck!
 
   / Caught by the inflation demon #47  
As an electrician i can say prices have gone nuts over last 6 months. On one recient project the price of underground wire went up 50% over the 2 weeks we worked on the job. Heck, a piece od 2” rigid conduit went from $48 last year to $197.00 last week.

i picked a good time to retire.

Gotta ask...where are you seeing $197.00 for a 10' stick of 2" rigid at?

Local Menards & Home Depot aren't even above $30 a stick for it around here.
 
   / Caught by the inflation demon #48  
I found this interesting today... Guardian does sell glass to residential window fabricators.

"Wow. Well on a day that it was announced U.S. Inflation was at its highest rate in 40 years, another bombshell was dropped. The news, in case you missed it, was a 40 percent price increase on glass from Guardian Glass, and that is not a typo. Forty percent."

The Friday Stunner
 
   / Caught by the inflation demon #49  
I add one more thing. In my experience as an expert witness in court, even the winner in a civil court case is a loser usually when you factor in the time, expense and the stress.
 
Last edited:
   / Caught by the inflation demon
  • Thread Starter
#50  
I all one more thing. In my experience as an expert witness in court, even the winner in a civil court case is a loser usually when you factor in the time, expense and the stress.
I agree - totally agree. Litigation is a terrible way to settle issues (but sometimes the only option). I told my daughter and SIL that we had grounds to sue but that we did not want to live with that (stress- expense - distracted from building the home) for 2-3 years and so we would move on with our lives.
 
   / Caught by the inflation demon #51  
IMO...Wait it out. The economy is on a rapid downhill slide right now. Interest rates are going to explode, layoffs are happening now and will be coming in droves over the next couple months. People will need work and money. This coming winter is going to be very very tough for many.
 
   / Caught by the inflation demon #52  
I agree - totally agree. Litigation is a terrible way to settle issues (but sometimes the only option). I told my daughter and SIL that we had grounds to sue but that we did not want to live with that (stress- expense - distracted from building the home) for 2-3 years and so we would move on with our lives.
Litigation is good for lawyers.
Beyond that I wouldn't trust a house that was built while under litigation.
Your thoughts of a smaller house and giving your present one to your daughter & SIL READS good but that may require a lot of changes and things don't always go as planned.
I had a similar with situation with my son and his family. Little 1 story and a half house, about 26x30 (on a half acre) I had been renting to a lady in Alexandria, VA. Son & his wife expected a baby, I had house "renovated". Then had an addition that almost doubled the value put on. Son & family were going to move north in 3 years. That was 2012. They are still there, and expecting a FOURTH child.
The things we do for our offspring.
 
   / Caught by the inflation demon #53  
Gotta ask...where are you seeing $197.00 for a 10' stick of 2" rigid at?

Local Menards & Home Depot aren't even above $30 a stick for it around here.
ship me some. North Coast and Platt electric supply. 197.00 per stick


heres a screen grab from Platt electric here in coeur d alene. price is per foot. has gone down a bit since last month...but hardly.



io pulled up your mainards website...we dont have them here. its alot cheaper...but not $30

Untitled.jpg





platt.jpg
 
   / Caught by the inflation demon #54  
ship me some. North Coast and Platt electric supply. 197.00 per stick


heres a screen grab from Platt electric here in coeur d alene. price is per foot. has gone down a bit since last month...but hardly.



io pulled up your mainards website...we dont have them here. its alot cheaper...but not $30

View attachment 750167




View attachment 750166
Ah, didn't realize you were talking about metal, thought you were referring to rigid plastic.

On a positive note the 2" metal is 19$ cheaper at my Menards, lol.
 
   / Caught by the inflation demon #55  
lately, my supply houses are letting me down big time. used to be cheaper than hd or lowes. not any longer.
 
   / Caught by the inflation demon #56  
lately, my supply houses are letting me down big time. used to be cheaper than hd or lowes. not any longer.
But can they get it?
Availability of supplies is getting to be an issue also.
/edit that would be an important thing - it's no good saving money if the item is not available.
 
Last edited:
   / Caught by the inflation demon #57  
lately, my supply houses are letting me down big time. used to be cheaper than hd or lowes. not any longer.

My local supply houses suck. They’re more conveniently located is the only reason I ever stop but Lowes is outselling them usually by a lot on virtually everything. One of them is named wholesale supply. More like retail plus 20 percent supply. And to make matters even better they close at 4:00 and of course don’t open weekends.
 
   / Caught by the inflation demon #58  
This proves once again that posting here is alway a wise first step. I am getting much advice, information and support and it is very much appreciated. I mean that.

I will think over my strategies - with the input received here.

Possibilities and likely: (all will be documented in emails)
Let them know that they will be in breach, but that settlement is a far better course - and make an offer to pay some of the increase - acknowledging they are getting hit with increases - but not my fault - and agreeing on any other details that may present issues going forward.
Depending on how that goes:
-cancel and get the refund (BTW - the builder said he hopes I will not cancel)
-get bids on the existing and approved plans
-consider tackling the build ourselves - and perhaps downsizing what we contemplated
-consider a totally different plan, a log cabin kit, or other options.
(I do see cabin kits at reasonable prices - downsized from what we were going to build, but recognize the issues they present)
-talk to some of the locals as to what they might be able to help with.

I will discuss all this with my (uber deserving) daughter and SIL tomorrow when they are both here.

BTW - in reliance on the agreed to contract price we proceeded with, and budgeted for everything else - well drilled, pad, road septic test holes, pump installed, water tanks bought and delivered and pad built for those, water yield tests and more.
Also consider panelized construction. Costs are kept down slightly due to being built offsite and avoids a lot of waste and extra time, etc.
 

Tractor & Equipment Auctions

2020 Deere 750K LGP (A53317)
2020 Deere 750K...
2011 MULTIQUIP LIGHT PLANT/ FUEL TANK TRAILER (A58216)
2011 MULTIQUIP...
2018 ARIENS RIDING MOWER (A56859)
2018 ARIENS RIDING...
FENCE PANELS (A58214)
FENCE PANELS (A58214)
2023 CAN-AM HD7 RTV (A59823)
2023 CAN-AM HD7...
2021 Allmand Bros Maxi-Lite II 20kW S/A Towable Light Tower (A55973)
2021 Allmand Bros...
 
Top