MikeFromVA
Silver Member
I am having a stamped concrete patio installed and the workers showed up today. When the salesman was here, he told us how they would excavate down about 4" and put in gravel before pouring the concrete onto the gravel base. The workers showed up today and started building the forms ontop of the grass/dirt without excavating. Their foreman told me that's the way they do it now saying that in the hard clay of Virginia, the water collects in the gravel (above the frost line) and heaves the patio when it freezes. He assured me that since they are using 4" thick 4000 PSI concrete, it would be fine. They have given me a 3 year guarantee in writing. Should I be worried?