Concrete pour - water cleanliness question

   / Concrete pour - water cleanliness question #11  
What are you making with the concrete? That could make a big difference.
 
   / Concrete pour - water cleanliness question #12  
What are you making with the concrete? That could make a big difference.

You got it.

A little algae is going to have less effect than how much water you use & how well its mixed.

Does not sound like some really critical, high strength job is needed.

Wet soupy mix reduces the strength.
 
   / Concrete pour - water cleanliness question #13  
You can most likely strain the dirty water like k0ua said, and it should be ok. The organic stuff (leaves, grass, twigs, bugs, and even frogs) will eventually decay leaving open 'pockets' in the concrete. Algae does the same on a smaller (almost microscopic) scale. The algae and dirt will hinder the portland cement's ability to stick to the aggregate (rocks) as mentioned earlier. I'd strain it really well and use it. Rusty rebar is not a good idea either, may want to pack a wire brush up the hill with yer water. Happy pouring!!!
 
   / Concrete pour - water cleanliness question #14  
The water needs to be "potable". In other words, it should be clean enough to drink. That's not say that it's bacteria free. If I saw that water being used on one of my jobs, I'd reject the pour.

The company I work for has 9 concrete plants, some on municipal water, some on drilled groundwater wells, and some on pond water, with the municipal supplies being the only potable source. Personally, I wouldn't think of any water supplied through a ready mix plant and then into a truck and out the hose in the back 'potable,' as those are for sure not a sanitary system...take a look in the sight tube of the water tanks on the next ready mix truck that shows up on your job site, reject said truck due to the water, and see if another truck from that company shows up to your job...then call the next supplier...you'd be out of business in a week...
To the OP: You should be just fine with collected rainwater, as long as it's free of too much sediment, our ponds are basically the same thing, probably dirtier yet than your system.

Sent from my LGL35G using TractorByNet
 
   / Concrete pour - water cleanliness question
  • Thread Starter
#15  
I'll be pouring a 12 X 16 foot slab for a small cabin. I plan on wire mesh plus some rebar (one corner is compacted fill).
 
   / Concrete pour - water cleanliness question #16  
For a cabin, with load bearing walls, I would want the maximum strength I could get from the concrete, which means I would use clean water. If I'm not willing to drink it, it's not clean water. But for a lot of projects around my place, I'll use pond water to mix concrete without a second thought. Especially for fence posts!!!!

Be careful on the wire mesh, it is impossible to pour and keep it in the middle of the slab. Even when you pull it up, you walk on it again and it goes straight to the bottom of the pad and sits on the dirt. In 100% of every slab that I've worked on where there was wire, it's always at the bottom of the slab, sitting on the dirt or plastic.

Rebar on chairs is the only way I would do it for myself or for my clients.

Eddie
 
   / Concrete pour - water cleanliness question #17  
there are folks that make decorations, out of concrete, and on purpose, mix in leaves, twigs, algae, etc... the effects give little "pot holes" per say, to more of a old aged look to the concrete. more so after everything rots away and just the concrete is left. with that said, i would want to keep large chunks of stuff out. or rather stuff that would rot over time.

==========
with above said...
12 x 16 concrete slab, and trying to manually use ready mix bags, and a 2 bag or so concrete mixer. i think you are over estimating, how much labor is involved. and how much actual time you have to work the concrete before things cure to much.

i would say you would be better off ordering a concrete truck, and either having it pumped, or wheel borrowed from truck to area. or other. trying to do it yourself and some friends *shakes head no* not that much concrete. i doubt a trailer of pre mix would be able to hold enough for size you are talking about.
 
   / Concrete pour - water cleanliness question #18  
I'll be pouring a 12 X 16 foot slab for a small cabin. I plan on wire mesh plus some rebar (one corner is compacted fill).

ALWAYS use either stainless steel fibers or other fibers in concrete. I poured a test sample of 2" concrete on compacted beach sand and I drive a 10K skid steer on it all day long and never a crack. I had a contractor pour a slab with no fibers and it's full of cracks. Yes still use the rebar, just *** the fibers, the cost is cheap and the benefits are AMAZING.
 
   / Concrete pour - water cleanliness question #19  
On1 thing for sure, in answer to a question like yours. The replies will be from "Go for it" to OMG don't do that.

Eddie Walker is probably the best builder on the site. Very meticulous & work above the ordinary.

With that said, it would be nice if you can tap into your tank a few inches from the bottom. Most everything that is in your tank will either settle to the bottom or float on top. Nice clean, drinkable water in the middle.

Once the slab is poured, set up & finished, cover it with the empty cement sacks & keep them wet at least 1 day, longer is OK. The slower it cures the less chance of it cracking.

Your mixer is about 2 wheel barrow loads, & a slab your size should be poured in sections. Depending on how much help you have about 6'X6' would be good for 2 real busy people.

Don't claim to be any kind of expert, but have mixed concrete since about 14. Grandad as a contractor & we had an old "Hit & miss" engine powered mixer. I was so lucky I got to feed it & truck (wheel barrow) the mix. :D

I poured a slab about the same size with 1 helper. Much larger sections will start to set up before your pouring is done.
 
   / Concrete pour - water cleanliness question #20  
I must agree with crash in the post above.

Bacteria in the rain water may make it unsafe to drink but won't affect the structure of the Crete. Now if the algae is bad it could. Add some bleach to kill the algae. Then if needed some Alum this will drop everything to the bottom of the barrel. You should have nice clean water on top. Do this a couple of days prior to pour.
If your barrel has a bottom spicket skip the Alum and steal your wife's pantie hose and filter as you drain into a bucket.

The size of your pad isn't bad as long as you have time. On a 12x16 pad look at a 6x8 pour. This will let you do 4 even pours. It will be a lot of work but is do able.

Post some pics.
 

Tractor & Equipment Auctions

2025 20ft. G70 Cargo Transport Chain (A51692)
2025 20ft. G70...
Bad Boy 747cc Outlaw (A50121)
Bad Boy 747cc...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
2025 Kivel Mini Skid Steer Fork Attachment (A50322)
2025 Kivel Mini...
Chevy Car (RUNS)(TITLE) (A50774)
Chevy Car...
Kubota BX2230D (A47384)
Kubota BX2230D...
 
Top