David Neisen

   / David Neisen
  • Thread Starter
#11  
No problem with the RANT, you are spot on. Congratulations for the future plans! Unfortunately, you left me no crumbs in figuring out how to post a question.... so this forum or this link is basically useless to me.
 
   / David Neisen
  • Thread Starter
#12  
Thank you much for the suggestion. I will do that here and again. (BTW: There is no such button anywhere above, so I may need to do more 'responses' before I get to post). So here we go.....

I have purchased acreage to build a final home. On my very clayey till, level site near a stand of trees, the previous owner had dug two 13' diameter pits, each 10' deep. I don't know why. Apparently he did not get a permit to do what he wanted, and he then refilled in both pits with the same hard clayey till, he dug out - except for a pile of boulders and stones left in a pile on the side. My QUESTION IS... both piles have settled an inch or two from the level of grade - How long will these pits need to completely settle so I can build on them? Is there a way to speed up that settling? Thanks.
 

Tractor & Equipment Auctions

2015 Peterbilt 320 T/A EZ-Pack Front Loader Garbage Truck (A51692)
2015 Peterbilt 320...
Year: 2014 Make: Ford Model: Fusion Vehicle Type: Passenger Car Mileage: 59,333 Plate: Body Type: 4 (A56859)
Year: 2014 Make...
1641 (A57192)
1641 (A57192)
GEHL RT175 GEN 3 SKID STEER (A52707)
GEHL RT175 GEN 3...
2019 Chevrolet Equinox AWD SUV (A55853)
2019 Chevrolet...
2002 Bobcat 763 Compact Skid Steer (A57024)
2002 Bobcat 763...
 
Top