Bigbear
Silver Member
Last night I started digging a small pond in some creek bottom land I own. The pond when finished should take up 1/3 to 1/2 acre. Am I crazy for trying this with a 35 hp tractor with loader, backhoe, box blade and tiller. For most of the pond depth I would like it to be about 3 or 4 foot deep, with some deeper holes for winter. The pond will be right next to the creek, could I dig a trench to the creek and utilize the water from it? There are several large trees that I plan on digging around and leaving, will this be a problem? I realize this is going to be a lengthy project, but the trackhoe guy that dug my last pond (won't hold water) says it will take him about 4 days at 1000 dollars a day. I will take some start pictures and post them later. Any info would be appreciated.