Bigbear
Silver Member
Last night I started digging a small pond in some creek bottom land I own.  The pond when finished should take up 1/3 to 1/2 acre.  Am I crazy for trying this with a 35 hp tractor with loader, backhoe, box blade and tiller.  For most of the pond depth I would like it to be about 3 or 4 foot deep, with some deeper holes for winter.  The pond will be right next to the creek, could I dig a trench to the creek and utilize the water from it?   There are several large trees that I plan on digging around and leaving, will this be a problem?  I realize this is going to be a lengthy project, but the trackhoe guy that dug my last pond (won't hold water) says it will take him about 4 days at 1000 dollars a day.  I will take some start pictures and post them later.  Any info would be appreciated.
	
		
			
		
		
	
				
			 
 
		