bjr
Veteran Member
I'm a DIYer and I've only done one shower stall. The poster that mentions the slope, I feel, is correct. I had a "L" shape walkin shower floor to do and I wound up using the "Dry Pack" mud (I died of sticker shock from the preslope foam packages) and a custom built slope. Then the rubber liner, tested by filling with water and letting it set, then another layer of "Dry Pack" mud then the tile. Kind of a pain to get the slopes right before the mud sets up. You need a good finish on the slopes to get the tile to set properly (I used the 2" squares). If you desire you can slope down from finish floor level (drain has to be set at a lower level) so you wouldn't need a raised sill to step over, just something to consider. bjr23