the site i was thinking of building a pond out of, is actually lower than the creek in some points. when i have somebody excavate the dirt from the upper end i wanted them to place it on the lower end. making the lower end about 20 yards thick, more than enough to drive around and stuff.
If packed with clay in mix, would this work or do i need like concrete and stone dam?
If packed with clay in mix, would this work or do i need like concrete and stone dam?