Perhaps I need to ask more direct questions.

How dry does it need to be before adding the rock and pouring concrete?

Will the moist, not wet, dirt shrink when it dries causing problems if poured over? Like I said if feels spongy,like walking on playdough, but it wont pack either, just moves around. The dirt is dark topsoil that is kind of silty.

Thanks
Chris
 
   / Floor Q for pole building #12  
Shouldn't the topsoil be removed (organic mixture decays & settles) and a few inches of gravel be put down & packed?

--->Paul
 
   / Floor Q for pole building #13  
I agree w/ Paul, topsoil is not a stable base for a floor. It should be taken out and replaced w/ gravel.
 
   / Floor Q for pole building
  • Thread Starter
#14  
Hi, perhaps the term topsoil is misleading. My reference to topsoil is the black dirt that is about 15' deep on that part of the land vs the brown dirt below and grey clay(?) even farther down.

The dirt in the pad doesn't have any organics, bean straw, corn stalks etc... mixed in with it. We scraped off the first foot or so and used the dirt underneath to build the pad. The pad is built up about 2' in the front and about 4' in the back. It was all packed with a CAT 815 sheepfoot in layers.
 
   / Floor Q for pole building
  • Thread Starter
#15  
I will be putting down rock and packing the rock before pouring.
 

Tractor & Equipment Auctions

2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
John Deere WG48A 48in Walk-Behind Mower (A51691)
John Deere WG48A...
CFG MH12RX Mini Excavator (A49461)
CFG MH12RX Mini...
1273 (A50490)
1273 (A50490)
BUSH HOG 3308R-2 LOT NUMBER 105 (A53084)
BUSH HOG 3308R-2...
2016 JOHN DEERE 3032E LOT NUMBER 94 (A53084)
2016 JOHN DEERE...
 
Top