Hello, Finally took the plunge and ordered a lake monitor 5-50 gpm flowmeter. Want to build a diagnostic setup and was wondering the correct order of components. Want to install a needle valve, relief valve, and possible a check valve to prevent reverse pressure. I have used OTC and other testers but the plumbing setup is all inside the box. Needed this because I have a lot of components from salvage and teardowns that should be matched for best performance rather than best guessing. Work on AG and Mobile Equipment on the side also and need to be able to properly diagnose systems. Thanks for any help. Currently building a firewood processor and have a lot of valves and two pumps that are unknown as to what they can handle. Craig
 
/ Flowmeter test setup #2  
Craig,
The neatest way to do this would be to use a HIC (Hydraulic Integrated Circuit) / manifold. This would reduce the package size, plumbing leak points, etc. I believe companies like Delta Power Co., Hydra-Force, Sun, etc. all have "pre-engineered" blocks that could be used for this function.
 
/ Flowmeter test setup #3  
Here are some examples.

https://www.cascorp.com/web2/downloads.nsf/0/6E3F57714F8DCB7388257B74007B021B/$FILE/6839920_Flow-PressKit6839908.pdf
 

Marketplace Items

FORD 4500 TRACTOR (A64280)
FORD 4500 TRACTOR...
PREVIEW DATES AND TIMES (A65563)
PREVIEW DATES AND...
2005 Peterbilt 378 Day Cab w/ Wetline 834826 (A62613)
2005 Peterbilt 378...
John Deere R15 Rotary Cutter (A64047)
John Deere R15...
3ft. 5-Point Metal Star (A61574)
3ft. 5-Point Metal...
2024 8R 370 Tractor (A63111)
2024 8R 370...
 
Top