Bo I have a section of 155' of yard that has to be driven over with the TC-40D year round because of our home based business. Needless to say in the winter or when it's really wet I end up with mud and deep ruts. In the past we just waited for the ground to firm up some then used the box-blade to knock off the high spots and fill in the low spots. I would then drag the landscape rake in reverse to smooth it all down before planting grass. Been doing this for 6 years with good results but it finally got old. /forums/images/graemlins/frown.gif
The first part of the week I finally dug out 155' X 10" wide X 12" deep worth of dirt, put down geofabric, spread 40 ton of #2 stone, and capped it with 40 ton of crusher run. Can you say smooth drive extension? No more mud! /forums/images/graemlins/grin.gif