So I am getting prices for grading a new driveway, pole barn pad and digging out a pond (fill dirt). So far I have gotten price of 15K and 16K. They are going to stripe the topsoil off of the driveway area and pole barn pad (save for leach field) and use the fill from the pond to build them back up. Both said they did not price in gravel for a base for the driveway and it should be fine for driving on. The driveway will only be used couple times a month, until the house is built in 2014, then i planned on having the driveway finished off.
My other option is getting the base gravel only and spreading it on the driveway myself then do the final layer after the house is done.
Would i be wasting my time and money putting any gravel on the driveway before the house is built? I am worried about the heavy trucks driving on it and and pushing the stone into the ground when we build the house (using Superior walls so they use a heavy crane too). The ground is mainly clay.
Suggestions?
My other option is getting the base gravel only and spreading it on the driveway myself then do the final layer after the house is done.
Would i be wasting my time and money putting any gravel on the driveway before the house is built? I am worried about the heavy trucks driving on it and and pushing the stone into the ground when we build the house (using Superior walls so they use a heavy crane too). The ground is mainly clay.
Suggestions?