Ground Beams and pouring a new slab next to an existing one.

   / Ground Beams and pouring a new slab next to an existing one. #21  
Gotta remember that aggregate size and edge distance for rebar are also a factor.
 
   / Ground Beams and pouring a new slab next to an existing one. #22  
3 years ago I had a 24x40 6" 4000# slab poured for a metal barn. No rebar but 2 saw cuts and the slab cracked on the saw cuts. There is no difference in elevation on the floor. It cost me $1800.00 for concrete and $1300.00 cash for the pour and finishing. My neighbor did a 24x26 and spent $8100 for his slab with rebar and mesh. Bill C
 

Tractor & Equipment Auctions

2023 Kubota L6060HST Compact Utility Tractor (A55315)
2023 Kubota...
Year: 2019 Make: Nissan Model: NV200 Vehicle Type: Van Mileage: 88,557 Plate: Body Type: 4 Door Van (A55853)
Year: 2019 Make...
2020 CATERPILLAR 259D3 SKID STEER (A52705)
2020 CATERPILLAR...
2017 Ford F-650 Mason Dump Truck (A56858)
2017 Ford F-650...
2016 FORD F-250 SUPER DUTY (A58214)
2016 FORD F-250...
Reading Classic I I (A57880)
Reading Classic I...
 
Top