jimjumper
Silver Member
When I first installed a new head gasket on my YM240D, I was able to find a written specific sequence of head bolt torquing that was very useful. It showed the 3 torque stages, the specific nut sequence for tightening, and the number of re-torques and at what times. Is there such a thing still out there? My service manual says to install the nuts to 18ft.lbs. and then in the back it shows the final torque to be 130. But no sequence or steps?