LittleBittyBigJohn
Veteran Member
I'm working on building a pond and I was not forward thinking enough to seperate the shale for a project later. I have a 20 ton track hoe now and will be getting a 10 ton dozer again this weekend. The plan is to save the shale and smooth out the rest of the dirt.
Do I keep shoveling it in front of me like I'm doing, or do I wait on the dozer so i can push it together? There are maybe 60 loads of shale and half again that much dirt to spread.
Do I keep shoveling it in front of me like I'm doing, or do I wait on the dozer so i can push it together? There are maybe 60 loads of shale and half again that much dirt to spread.