I like the L45 but to be honest I always wished it had a little more loader lifting capacity. An L45 with the lifting capability of the M59 would be ideal for me. I looked seriously at the M59 before purchasing the L45 but the only one I could find was used and so in the end I went with the slightly lighter weight and full warranty of a new L45.
This spring I was finishing up removal of an old retaining wall for a customer and the L45 was struggling to lift some of the broken up concrete foundation pieces. I mentioned to my customer that I wished I could get larger cylinders for the L45 which would increase its lifting capacity. He then tells me that he is in the hydraulic cylinder fabrication and repair business and he could fabricate a new pair of cylinders for me. We took some measurements and determined that we could install cylinders which would increase the lift capacity of the L45 by about 50%. I agreed to do one days work for the client free of charge and in exchange he would have two new loader lifting cylinders fabricated for me. Unfortunately it took him longer than I had hoped to fabricate the cylinders and when I did finally receive them there were a couple of machining issues but he corrected the problems and I finally installed them yesterday.
Attached are a few photos showing the new and factory cylinders. The new cylinders are about 1/2" larger in diameter and what a difference. With the factory cylinders I could barely lift the rock on the forks off the ground. With the new cylinders installed in the photo at idle I can lift that same rock right to the end of the cylinder stroke. I am sure the lifting speed is slightly slower due to the increased amount of oil that has to flow but I did not notice a significant degradation in performance during an hour or two of moving things around yesterday.
I am very pleased with the "new" Super L45!
Regards,
Lauren
This spring I was finishing up removal of an old retaining wall for a customer and the L45 was struggling to lift some of the broken up concrete foundation pieces. I mentioned to my customer that I wished I could get larger cylinders for the L45 which would increase its lifting capacity. He then tells me that he is in the hydraulic cylinder fabrication and repair business and he could fabricate a new pair of cylinders for me. We took some measurements and determined that we could install cylinders which would increase the lift capacity of the L45 by about 50%. I agreed to do one days work for the client free of charge and in exchange he would have two new loader lifting cylinders fabricated for me. Unfortunately it took him longer than I had hoped to fabricate the cylinders and when I did finally receive them there were a couple of machining issues but he corrected the problems and I finally installed them yesterday.
Attached are a few photos showing the new and factory cylinders. The new cylinders are about 1/2" larger in diameter and what a difference. With the factory cylinders I could barely lift the rock on the forks off the ground. With the new cylinders installed in the photo at idle I can lift that same rock right to the end of the cylinder stroke. I am sure the lifting speed is slightly slower due to the increased amount of oil that has to flow but I did not notice a significant degradation in performance during an hour or two of moving things around yesterday.
I am very pleased with the "new" Super L45!
Regards,
Lauren