Figured I'd start a thread about what I wa sup to this weekend ...
Once the stump was out on the north side of the shop, I got the crater filled ...

I'm going to level here (well, nearly ... 1/4" per foot slope), and lay down 4-6" of 3/8" minus gravel base.
I'm using the south side slope for the "cut" to fill on the north side ... here's 3/4" of the first pass there.

The 'ole JD crawler is there on the right ... it still gets put to work, but being 50 years old, it's not the workhorse it once was ... makes a nice "final grade" machine tho!
The "pad" on the north will have a 3' retaining wall that I'm making "log crib" style for now. (this is about half done).

I've done these before and last 10 years or so ... I figure to come back and do block wall at some point ... (aka I can afford it).
Once the stump was out on the north side of the shop, I got the crater filled ...

I'm going to level here (well, nearly ... 1/4" per foot slope), and lay down 4-6" of 3/8" minus gravel base.
I'm using the south side slope for the "cut" to fill on the north side ... here's 3/4" of the first pass there.

The 'ole JD crawler is there on the right ... it still gets put to work, but being 50 years old, it's not the workhorse it once was ... makes a nice "final grade" machine tho!
The "pad" on the north will have a 3' retaining wall that I'm making "log crib" style for now. (this is about half done).

I've done these before and last 10 years or so ... I figure to come back and do block wall at some point ... (aka I can afford it).