Looped tiedown chains?

   / Looped tiedown chains? #11  
I think this is because the DOT wants the load to be shared by each "leg" of the chain. If you think of it this way, a large object sitting on a trailer starts with a chain connected one side of the trailer, then passes over the load, and is connected on the other side of the trailer with a binder somewhere in there to take out the slack. Each leg of the chain only sees half of the load in theory.

I believe that if you fix the binder to a trailer, and connect it to a load with a short length of chain, that they only give you credit for 1/2 of the WLL of the chain; which is total BS. Someone else can jump in here and cite the FMSCA if they want to.
 

Tractor & Equipment Auctions

2015 FREIGHTLINER CASCADIA DAYCAB (A53843)
2015 FREIGHTLINER...
2019 Caterpillar DP35N 7,000lb Diesel Forklift (A51691)
2019 Caterpillar...
2017 JOHN DEERE 333G SKID STEER (A53843)
2017 JOHN DEERE...
2002 CATERPILALR D8R HI-TRACK CRAWLER DOZER (A52707)
2002 CATERPILALR...
2025 JMR 36in Bucket Mini Skid Steer Attachment (A55851)
2025 JMR 36in...
2003 Sailfish 188 18ft. Boat with S/A 20ft Boat Trailer (A55853)
2003 Sailfish 188...
 
Top