You dont have to go through with the purchase. Mineral rights not being included in the sale is no minor detail. They may exercise their right to mine the gravel out with you not being able to have a say in it. Not disclosing leased or sold mineral rights or making false statement concerning them amounts to fraud at the least and there is also a dollar amount for those leases whether they are used or not. You could always renegotiate for a lower price. Keep both eyes open
Plus, I'd be contacting the state realtors assn. and Attorneys General office.
 
/ Mining Agreements #22  
Most offer letters will mention mineral rights, timber rights, ect. Its not all negative though, but you do need to know everything to make an informed offer.

That 10 acres of potential mine may be an open pit for your entire life, or they may have to restore it (regrade, potential fill the pits, or atleast spread the over burden, possibly plant trees, ect). What might be 10 trucks per day now, could be 100 trucks in 3 years, or it might not.

How does an open pit mine work with only mineral rights? Around here, the sand or rock mines are generally owned or leased, mineral and surface together. Im guessing they can force the issue, as it is their sand/gravel; but its your surface. Im Guessing if it went to arbitration, you would be forced to allow it, and they would be forced to pay for the cost of the lost use of the surface land, in its current state.

 
/ Mining Agreements #23  
So, yes, I Chat'd it, But I also followed the source link to DEC website.

So, it looks like the pit has to be reclaimed, and they will purchase a Bond to ensure it. Now, its a 5 year operating permit, but with the potential to renew. So, with that you can pretty much bet it will be atleast 5 years before reclaimed.

Now, here's the part people dont often talk about; they Likely will ask for a surface lease, with terms better than the current land use. So, if its pasture, and thats going annual lease is say $120/acre/year; they will Likely offer far more. Like 10x, just to avoid the fight, and honestly, to avoid problems. With it having a bond to reclaim, if you could get, say, $6,000/year; some access roads, or say, $0.25/ton, that sounds like an income stream, and a plus
 
/ Mining Agreements #24  
Now, another thing, a 10 acre sand mine is a big borrow pit, but a tiny sand mine. There is a big difference. Borrow pit, for fill dirt, may operate every day, or only a few days per week, and likely has 1-3 operators and then lease truck dump trucks hauling.

Sand mine, could be dredge, 24/7, hauling 100s of trucks and/or rail cars.

So, 1st picture is a medium-large sand mine, about 900 acres of active open pit sand mine, dredged below the water table.

The 2nd picture is a borrow pit for clean fill for building pads, embankment, ect, all above the water table, about 32 acres.

The 3rd picture is a reclaimed borrow pit, right north of that other one; grassed, trees growing and a large pond/small lake, that "looks" natural.
Screenshot_20260310_190352_Google%20Earth.jpg
Screenshot_20260310_190446_Google%20Earth.jpg
Screenshot_20260310_190924_Google%20Earth.jpg
 
/ Mining Agreements #25  
Be very careful, and get a legal counsel is what I would recommend.
Permits to open pit mine here, that were pulled in the 1950's and 1960's are still grandfathered for enviromental impact. In other words no further reviews and no one has any say on what time the mine runs or where the materials go or how much they take in one day. Only condition is dust mitigation must be performed. One barge a week leaves the site. There will be a 240 acre pit next to the river when everything is extracted. Currently at 160 acres mined. All because final permits were pulled early 1961.

Find out every legal detail possible before proceeding.
 

Marketplace Items

2018 Freightliner M2 106 AWD Altec AA55 56ft. Bucket Truck (A60352)
2018 Freightliner...
John Deere 4440 (A64119)
John Deere 4440...
FORD SUPER DUTY TAILGATE (A64281)
FORD SUPER DUTY...
2012 Chevrolet Silverado 1500 4x4 Crew Cab Pickup Truck (A61573)
2012 Chevrolet...
2019 CATERPILLAR 326FL EXCAVATOR (A62129)
2019 CATERPILLAR...
2018 Chevrolet Silverado 1500 Crew Cab Pickup Truck (A61573)
2018 Chevrolet...
 
Top