All was going well. We had the new commode line connected to the main line to the septic, but when we cut the hole for toilet flange ..... an 8" heating duct peaked up through the hole and said, "Na, Bubba, na." "Oh yeah?" we said, and cut the duct, replacing it with 8" flex duct and jogging the toilet line around it. Pic attached.